Free quotes · Omaha, NE
(402) 227-6224
Omaha, NE · Deck building

Three-season rooms and screened porches in Omaha

Screening in a deck, or enclosing it as a three-season room, gives it a roof and walls. You get more months out of it and can sit out in weather that would empty an open deck.

We are a lead referral service, not a contractor. Free, no-obligation quotes.

Screened porch with a vaulted wood ceiling, sofa and dining set

What can be built

  • Screened porches, over an existing deck or a new one.
  • Three-season rooms, closed in with windows.
  • Roofs tied into the house.

Questions for the builder

  • Is the current deck frame strong enough for a roof?
  • Where and how does the new roof meet the house, and how is it flashed?
  • Which permits and inspections apply once there is a roof?

Keep reading

More in Omaha

Related services

Curved wood deck with a railing above a lake in winter

Custom wood decks

Cedar, pressure-treated pine or hardwood decks, with the fastening chosen to suit the boards.

Wooden chairs and table on a sunny deck

Composite and PVC

Composite systems such as Trex, TimberTech and AZEK, matching rail included.

Wide view of aged wood deck boards

Deck resurfacing

Composite boards laid on the existing frame, when that frame is sound.

Before you call

Common questions

What does Omaha's code say about deck footings?
Omaha's adopted residential code sets the frost line at 42 inches, and a deck supported by the house needs footings below it; a deck that stands free of the house is exempt from that rule. Check permit requirements for your address with the city before work starts.
Should I build with wood or composite?
Wood is cheaper to start and needs staining or sealing over time. Composite costs more, and Trex says its boards never need stain or paint. NAHB estimates a wood deck lasts about 20 to 30 years in northern climates. Omaha's code also rates termite risk moderate to heavy, which matters for the wood frame under either.
Can new boards go on the old frame?
If the frame is sound and up to code, resurfacing may be enough. That is for the contractor to inspect and state in writing.
How long does it take?
It depends on the size, the material, the inspections and the weather. The quote should include a schedule.
Step one

Get a written quote

Describe the deck and a licensed Omaha deck builder will contact you about a site visit. The quote is written once they have seen the yard, the house wall and the ground.

  • Free, with no commitment
  • Itemised in writing before work is agreed
  • A single builder gets in touch

Or call (402) 227-6224

Call (402) 227-6224 Quote